|
Porsche 911 Roll Cage Installation
Step 1 - Set Car On Level Floor | Set up the 911 on a level floor or alignment rack. |
Step 2 - Assemble Cage in Car | Assemble the 4 section of the roll cage in the car (Front, Back, 2 Sides). If you have an interior, you will need to pull back the carpet. |
Step 3 - Mark and Prep Contact Points | Using a permanet marker, mark where the roll cage contacts the floor. Make sure to mark the centers to drill out holes for the nuts in the cage mounting plate.
NOTE: The holes in the front are bigger than the holes in the rear. Don't make my mistake and make the holes in the back too a big. They only need to be as big as the bolt holes on the cage rear contact pad on the wheel well |
Step 4 - Weld Front and Center Mount Plates | The front and center contact points are on welded plates. The rear contact point uses a sandwich style clamp. |
Step 5 - Seal and Protect Welds | Use a paintable rubber sealer (3M) to protect welds. |
| Paint the cage and contact points. |
|
|